South Pars Gas Field Development (Phases 19)
Technical evaluation and revising laboratory drawings (including laboratory building layout, laboratory furniture and equipment arrangement layout, electrical layout, utility distribution layout, pure gases distribution layout, laboratory hoods and HVAC layout, etc.), preparation of laboratory equipment list, specifying the requirements and technical specification (MR and data sheet) of laboratory equipment, technical bid evaluation |
South Pars Gas Field Development (Phases 13)
Technical evaluation and revising laboratory drawings (including laboratory building layout, laboratory furniture and equipment arrangement layout, electrical layout, utility distribution layout, pure gases distribution layout, laboratory hoods and HVAC layout, etc.)
Specifying the requirements and technical specification (MR and data sheet) of laboratory equipment, technical bid evaluation
South Pars Gas Field Development (Phases 15-16)
Technical evaluation and revising laboratory drawings (including laboratory building layout, laboratory furniture and equipment arrangement layout, electrical layout, utility distribution layout, pure gases distribution layout, laboratory hoods and HVAC layout, etc.), preparation of laboratory equipment list, specifying the requirements and technical specification (MR and data sheet) of laboratory equipment, technical bid evaluation
South Pars Gas Field Development (Phases 22-23-24)
Specifying the requirements and technical specification (MR and data sheet) of laboratory equipment and technical bid evaluation
KORDESTAN LDPE Petrochemical Company
Laboratory design (including laboratory building layout, laboratory furniture and equipment arrangement layout, electrical layout, utility distribution layout, pure gases distribution layout, laboratory hoods and HVAC layout, etc.), preparation of laboratory equipment list, specifying the requirements and technical specification (MR and data sheet) and technical bid evaluation
BAKHTAR Petrochemical Company (LLDPE/HDPE/Butene-1 plant), LORESTAN Petrochemical
Laboratory design (including laboratory building layout, laboratory furniture and equipment arrangement layout, electrical layout, utility distribution layout, pure gases distribution layout, laboratory hoods and HVAC layout, etc.), preparation of laboratory equipment list, specifying the requirements and technical specification (MR and data sheet) and technical bid evaluation
ANDIMESHK Petrochemical Company
Laboratory design (including laboratory building layout, laboratory furniture and equipment arrangement layout, electrical layout, utility distribution layout, pure gases distribution layout, laboratory hoods and HVAC layout, etc.), preparation of laboratory equipment list, specifying the requirements and technical specification (MR and data sheet) |
BAKHTAR Petrochemical Company (LLDPE/HDPE/Butene-1 plant), MAHABAD Petrochemical
Laboratory design (including laboratory building layout, laboratory furniture and equipment arrangement layout, electrical layout, utility distribution layout, pure gases distribution layout, laboratory hoods and HVAC layout, etc.), preparation of laboratory equipment list, specifying the requirements and technical specification (MR and data sheet) and technical bid evaluation |
Laboratory of SANGAN Steel production complex
Design of central laboratory (including laboratory building layout, laboratory furniture and equipment arrangement layout, electrical layout, utility distribution layout, pure gases distribution layout, laboratory hoods and HVAC layout, etc.)
Supervision of contractor during construction
Laboratory of SALMAN FARSI Petrochemical (PDH Project
Consulting services to evaluate and revise the laboratory equipment list, technical evaluation of laboratory equipment and evaluation of conformity to meet the project requirements (in according to samples specifications, analyts and analytical methods) |
SADAF ESBR Petrochemical Plant
Laboratory design (including laboratory building layout, laboratory furniture and equipment arrangement layout, electrical layout, utility distribution layout, pure gases distribution layout, laboratory hoods and HVAC layout, etc.), preparation of laboratory equipment list, specifying the requirements and technical specification of equipment (MR and data sheet) |
Laboratory of MIANEH Steel production complex
Supply of laboratory equipment (including carbon sulfur nitrogen and oxygen analyzers, XRF, OES, metallography, physical test equipment, balance, sample preparation equipment, laboratory general purpose equipment, etc.), laboratory chemicals, installation start-up and training at site |
Utility Laboratory of MIANEH Steel production complex
Laboratory equipment supply contract (including GCs, titrators, Karl Fischer, particle counter, viscometer, densimeter, flash point, pycnometer, physical test equipment, balance, sample preparation equipment, general purpose equipment, etc.) laboratory chemicals, installation start-up and training at site |
Central Laboratory of DELVESEH (Food Industry)
Design of central chemical and microbiological laboratory (including laboratory building layout, laboratory furniture and equipment arrangement layout, electrical layout, utility distribution layout, pure gases distribution layout, laboratory hoods and HVAC layout, etc.)
Supervision of contractor during construction
BUSHEHR Olefin Plant (BUPC)
Laboratory design (including laboratory building layout, laboratory furniture and equipment arrangement layout, electrical layout, utility distribution layout, pure gases distribution layout, laboratory hoods and HVAC layout, etc.), preparation of laboratory equipment list, specifying the requirements and technical specification of equipment (MR and data sheet) and technical bid evaluation |
JAM Petrochemical
Laboratory design (including laboratory building layout, laboratory furniture and equipment arrangement layout, electrical layout, utility distribution layout, pure gases distribution layout, laboratory hoods and HVAC layout, etc.), preparation of laboratory equipment list, specifying the requirements and technical specification of equipment (MR and data sheet) and technical bid evaluation |
Specifying the requirements and technical specification of equipment (MR and data sheet) and technical bid evaluation |